Our Story

 

Case Studies

At Prime Lane, every project is an opportunity to demonstrate specialist care, technical precision, and complete accountability. Our case studies highlight the breadth of what we do: data‑centre and IT relocations, technical logistics, secure server moves, and professional art handling for galleries, collectors, and creative institutions. Whether transporting high‑value equipment or delicate artworks, we operate with transparency, speed, and absolute attention to detail. Explore how our team delivers safe, reliable solutions across the UK and Europe.

 

Atlas Edge - Portugal

Case Study - December 2025

Mobilising within days, the team packed and transported sensitive servers using specialist materials, strict chain‑of‑custody controls, and coordinated on‑site support. Despite a developing construction environment, the move was completed safely, ahead of schedule, and without equipment damage which demonstrates Prime Lane's precision and reliability in technical logistics.

 

 Breakfast studio - Art Move

Case Study - December 2025

Prime Lane was commissioned to relocate a single high‑value electronic artwork within London, requiring a blend of technical handling and specialist care. The piece demanded controlled packing, secure transport, and precise installation to protect both its digital components and physical structure. 

 

Packing and Delivery Service  in London and the United Kingdom

Swansea Museum - Model

Case Study - December 2025

Prime Lane was commissioned by Swansea Museum and BP to relocate a 3‑metre, 700kg model from a glass display cabinet within the museum's storage facility. The project required specialist handling to extract the model safely, transport it through the building, and prepare it for long‑distance travel. 

Coming soon

 

 

Coming soon

 

 

coming soon

 

 

coming soon

 

 

coming soon